114 - Hero Blog

Delivery Time: Standard Container, Featured Product, and Custom Modified Container

Clock_horloge_conteneur_conteneurs experts_délais de livraison_délais de fabrication

Introduction – Why Knowing Delivery Times is Essential Before Buying a Container?

Do you have a project and need a container quickly? Whether it’s a standard container, a pre-modified model ready for delivery (Featured Product), or a fully customized container, delivery time varies significantly.

Many customers assume that a custom-modified container can be ready in just a few days. However, the more customization involved, the longer the process takes. Between design, technical adjustments, and manufacturing, a custom project requires careful planning.

In this article, you’ll discover the real delivery times for each type of container, why certain modifications take longer, and how to anticipate your project timeline to avoid unexpected delays.


 

Delivery Time for a Standard Container – Availability and Shipping Time

If you need a container without modifications, this is the fastest option. Standard containers (20 feet, 40 feet, high cube, etc.) are generally in stock and ready for delivery.

How long does it take to receive a standard container?

  • Availability: Immediate or within a few days, depending on inventory.
  • Delivery time: Generally 2 to 7 business days, depending on distance and transport logistics.
  • Factors that may affect timing: Limited stock, peak demand periods, or complex transportation.

💡 Tip: If you’re on a tight schedule, it’s best to reserve your container as soon as possible to avoid delays due to availability or transportation.


 

Delivery Time for a Featured Product (Popular Modified Containers) – What Models Are in Stock and Ready to Ship?

If you need a container that has already been modified with common improvements (such as extra doors, insulation, a basic electrical system, or windows), you can opt for one of our Featured Products.

🔹 What is a Featured Product?

Featured Products are containers modified with the most requested features by our customers. Since these models are pre-modified in advance, they are almost always in stock and available for fast delivery.

How long does it take to receive a Featured Product?

  • Availability: Immediate or within a few days, depending on inventory.
  • Delivery time: Around 5 to 10 business days, including preparation and transportation.
  • Factors that may affect timing: If a specific model is out of stock, you may need to wait for the next production batch or adapt an available model.

💡 Tip: If you need a modified container quickly, ask for the list of Featured Products currently available. You may find an option that meets your needs without additional modifications.


 

Delivery Time for a Custom Modified Container – Why It Takes Longer and What to Consider Before Ordering

If you need a fully customized container, be prepared for a longer wait. Unlike Featured Products, which are pre-modified and ready to ship, a custom container requires detailed planning, specific adjustments, and manufacturing time.

How long does it take to receive a custom-modified container?

  • Design phase: Typically 1 to 4 weeks, but it can take longer for complex or highly customized projects.
  • Manufacturing and modifications: Usually 4 to 8 weeks, but this can extend to 16 weeks during peak periods.
  • Total estimated time: Between 6 and 16 weeks, depending on project complexity and production workload.

Why does a custom-modified container take longer?

  • Every project is unique: Unlike Featured Products, where modifications are standardized, a custom project requires additional adjustments and approvals.
  • Material availability: Certain components (special doors, windows, electrical systems, etc.) may extend the timeline if they need to be ordered.
  • Fabrication and installation time: The more complex the modifications (specific insulation, air conditioning, interior partitions, etc.), the longer it takes.

📌 When do we confirm the exact delivery date?

We officially commit to a delivery date only when the final manufacturing plans are approved (signed off by the client). Before this step, we are still in the design and development phase, making it difficult to provide a precise timeline.

💡 Tip: Plan ahead! If you’re in a hurry, talk to our experts to see if a Featured Product can be quickly adapted to your needs.


 

How to Plan a Custom Project Properly? – Key Steps to Avoid Delays

If you’re considering a custom-modified container, proper planning is crucial to avoid delays and optimize timelines.

1. Clearly define your needs from the start

The clearer your requirements, the faster the design phase. Think about:

  • Container size and type
  • Interior layout (office, storage space, living space, etc.)
  • Insulation, heating, air conditioning
  • Electrical and plumbing installations
  • Doors, windows, and other openings

💡 Tip: A well-defined project from the beginning prevents unnecessary back-and-forth discussions and speeds up plan approval.

2. Be responsive during the design phase

The design phase can take 1 to 4 weeks, or longer for complex projects. Any delay in approving the plans results in a delay in manufacturing.

💡 Tip: The faster you approve the plans, the sooner we can start production.

3. Anticipate fabrication time and peak seasons

Under normal conditions, manufacturing takes 4 to 8 weeks, but during high demand, it can extend to 16 weeks. If you have a fixed deadline (event, construction project, relocation), it’s essential to place your order in advance.

💡 Tip: Order several months ahead if you want to avoid peak season delays.

4. Understand that the delivery date is set after final approval

Before the manufacturing plans are signed off, we cannot guarantee a specific delivery date.

💡 Tip: Don’t schedule your project based on an estimated timeline before plan approval.


 

Conclusion – Summary of Delivery Times and Tips for Choosing the Best Option

📌 Delivery time summary by container type:

  • Standard container: 2 to 7 business days
  • Featured Product (popular modified model): 5 to 10 business days
  • Custom-modified container: 6 to 16 weeks, depending on complexity and workload

If you have an urgent need, check the availability of Featured Products, which offer a quick and ready-to-use solution. If you need a custom container, plan your project well in advance to avoid frustration due to delays.

💡 Need a container quickly? Contact us now to check available models!